INTRODUCTION
PROBLEM #1: MARKETING
PROBLEM #2: EDUCATION & COLLABORATION
PROBLEM #3: MONEY
SUMMARY
INTRODUCTION
The polar ice is melting and as far as the planet is concerned, engineers are wasting their time if the projects they so carefully develop are not implemented and deliver no value. This article refers to “good” projects as those with a 3 year payback or less. Why don’t “good” projects get implemented? There are a variety of reasons and a few common barriers:
1. Marketing (under-marketing a project’s value)
2. Education & Collaboration (not expanding the value of a project)
3. Money (not having a positive cash flow solution)
If a project can’t beat these criteria, it probably won’t be implemented anyway… so focus on the ones that will!
PROBLEM #1: MARKETING
People often ask me why marketing is first on the list. Answer: because NOTHING HAPPENS WITHOUT A SALE. For example, your first job (or your first date) began with you “selling yourself” on a resume or during an interview. In fact, the development of every product/service begins with someone selling a solution to some type of problem. Now, I am not saying that selling/convincing is “bad” or un-ethical. Convincing someone when it improves their lives is good and can be done with passion. When something (like an energy management project) is great, we should sell the benefits with all the passion in the world. You would do the same when talking to your kids about “getting a good education”, or “learning good manners”. Passion can also emerge from fear, such as from the chaos and the violence that occurs during an electrical blackout. Most of the time, humans are more passionate and action-oriented when they are at risk of losing something versus gaining something.
So, we must communicate in a way so the audience (the buyer or project approver) can understand the problem/pain that they are in now. After they agree that they are “in pain”, then they will want to hear about potential solutions.
Attention:
It starts with getting the buyer’s attention on the problem, the pain it is causing and a sense of urgency to solve the problem. Only then will a solution seem to be logical. In addition, after they understand the problem/pain, they will be able to become passionate about the solution.
If you fail to get the attention of the approver, you are actually doing them a dis-service; they won’t know they are in trouble and are wasting money. It is like allowing someone to bleed to death when they don’t even know they are cut. So, don’t be shy- You have a duty to perform.
Warning! Some approvers personalities’ won’t like to hear about problems/pain. Some approvers may “put their head in the sand” (like an ostrich) when problems are discussed. Don’t blame them- it is their personality (which has strengths in other areas). Discover ways to communicate in a way that they will respond. FYI- it can take 7 impressions (explanations/presentations) before some people will agree on the problem and take action on a solution. Don’t give up and don’t be surprised or depressed when they don’t take action after the first impression.
Below are a few examples of effective headlines that can help get the attention of an approver. Feel free to use these in executive summaries:
• “How will the shareholders feel about us throwing money away every month?”
• “A way to make money while reducing emissions…”
• “What will we do with the Yearly Savings?”
• “We are paying for energy-efficiency projects, whether or not we do them!”
• “Guaranteed, High-Yield Investments…”
• “If you enjoy throwing money away every month, don’t read this…”
• “4.6 Billion Years of Reliability… Solar Energy”
• This Project could improve our Stock Price by over 20%!
• “Good Planets are hard to find”
There are many other great proven examples that are available. However- you can experiment by looking around for “marketing copy” in magazine advertisements, commercials, etc. There is a reason they call it “copy”- some of the principles are thousands of years old, and they still work! Just change the words to relate to your problem/solution. Try a few versions and test, test, test to see which ones are most effective. Go for it!
Benefits :
After you have their attention, be sure that you include compelling benefits that “take away the pain” that the audience is feeling. As engineers, we are good at mentioning the typical benefits:
• Saves energy, money, waste and emissions;
• Offsets the cost of a planned capital project;
• Improves cost-competitiveness, productivity, etc.;
• Is a relatively low-risk, high-profit investment that directly impacts the bottom line .
In today’s green-minded economy, we could also demonstrate that “green” projects are a very effective marketing tool (which could get the client’s marketing department behind your project), because these benefits have also been proven :
• Improves the client’s “green” image;
• Differentiates the client from the competition ;
• Introduces them to new markets, suppliers and clients , ;
• Helps them grow sales/revenue.
However, we should also mention the passionate, global and moral reasons behind a good “green” project:
• Slows global warming, reduces acid rain;
• Reduces mercury pollution, which allows us to eat healthy;
• Improves our national energy independence;
• Reduces security/disaster risks, etc..
Dollar values for these benefits can often be calculated and should be included in your proposal. To calculate the “green benefit equivalencies”, such as “number of trees planted” (from reduced power plant emissions), see the “Money” section of this article.
The list above can be expanded, refined and optimized for any project. To build a list like the one above, one technique is: “WSGAT”: “What is So Good About That?” Ask that question for every project feature, and you will develop a long list of passionate benefits. By the way- this approach has been used in TV sales and has helped sell billions of dollars of material . If they can sell this much junk on TV, we should have no problem selling green projects that are factually saving the planet! Add the emotional benefits of going “green”, and you will have a project that touches the hearts of leaders in your organization.
Call to Action:
The “call to action” becomes easy and logical when all of the benefits have been quantified and they are aligned with the client’s strategic objectives. Tell the approver what you want them to do and why. Be sure to include the “cost of delay” in your executive summary. Remind them that they are “in pain” and the project/solution will solve it. Visual aids can be helpful. For example, during one presentation, buckets of dollars were shoveled out a window to demonstrate the losses that were occurring every minute. The executives were literally in pain watching those dollars fly away. They couldn’t stand it, and they took action. It is OK to get creative and have some fun in your presentation!
BUT WAIT… THERE IS MORE! “Configuring” your presentation can make the difference between immediate approval and further delay. There are many ways to “configure” or “package” your product/project so that it is IRRESISTABLE. One way to do this is to find a way to make a project’s performance guaranteed or “risk-free”. Another way is to separate (or add) one part of the project and introduce it as a “free bonus”. Everyone likes a “FREE” bonus- it helps them understand that they are getting a “good” deal. For example, on a recent “green”, facility-related project, carbon offsets for a company’s fleet were included as a free bonus. The bonus delighted the client and differentiated the project, (and it was extra value) yet the additional costs were less than $1,000.
Engineers can be two, three or ten times more productive by developing sales and marketing skills. However, there is another reason for developing these sales/marketing skills: Your Career! The skills you learn will be valuable to your organization (as well as other organizations). These skills are transferable to other industries too. So keep this in mind when you are investing in yourself… there will almost always be a fantastic pay-off.
Finally, there are two prerequisites that a buyer must see in you before any sale is made: “Trust” and “Value”. As far as trust goes, it must be earned and once it is earned… it must be cherished. To accelerate the buyer’s trust in you: be an advocate for the client and put their needs ahead of your own. Assume the role of their “most trusted advisor”, (and then deliver). Value comes from applying knowledge, tools, resources, partners, etc., in the best way for the client, which is why education and collaboration is such an important component of success. This is discussed further in the next section. Be sure to read the sub-sections on Reciprocal Business Agreements, Joint Ventures and Incentives/Rebates… great ideas!
PROBLEM #2: EDUCATION & COLLABORATION
Knowing how to deliver the value is an area that requires continuous updating. Today, with the proliferation of energy/green technologies, it is impossible for one person to know all the ways to add value to a project. Green specialties are expanding every day. For example: energy efficiency, water efficiency, green janitorial, LEED , recycling, transportation, etc..
Learn all you can, then collaborate with other professionals (who are also actively learning) and the value available to your clients’ increases exponentially. It is important to be open to new ideas and fresh perspectives in this process. “Mind-Sharing” or brain-storming techniques can facilitate the process and maximize the number of useful ideas.
Fortunately, education is a low-cost investment. Collaboration and even joint-ventures/partnering can be done inexpensively as well and the returns can be huge!
Free Sources of Green/Energy Efficiency Education:
https://www.aeecenter.org/seminars/
http://www.eere.energy.gov/
http://www.ashrae.org/education/
www.usgbc.org
www.ase.org
www.energystar.org
http://greeninginterior.doi.gov
In addition, there are many innovative ways to bring more value to a project. Some include:
• Reciprocal Business Agreements
• Joint Ventures
• Free Tax and Utility Incentives/Rebates
Reciprocal Business Agreements:
For Example: After presenting a $1,000,000 service contract for a global car rental company, the deal was sweetened with an agreement on our part to choose that car company while traveling, which generated over $1,000,000 in extra car rentals for them. To the client, they were getting an extra $1,000,000 in revenue by working with us versus the competitors. What suppliers, partners, colleagues, professionals, etc. could you develop reciprocal business agreements? How could you help two clients (or a supplier) benefit from each other? How could you help them become more “green”?
Another Example: We helped client #1 supply green solutions to client #2. Both clients were extremely happy to generate more sales / save money. When it was time to approve our next round of projects, there was little resistance, because we had helped them earn / save far more than the costs of the proposed projects. This illustrates the value of being the “trusted advisor”.
Joint Ventures:
For Example: A “green” travel agency gives 50% of its commissions back to its clients in exchange for their travel business. The client can use this extra, free money to fund “green” initiatives or scholarships, or other social programs. The travel agency guarantees the lowest prices and easily doubles its business because it delivers more value to its clients via joint ventures.
Free Tax and Utility Incentives/Rebates:
For Example: In California, 50% of a solar project was funded by federal and state rebates. Utility incentives lowered the installation costs even further. There are numerous free tax and utility incentives available, and some are discussed in the next section.
In addition to the options above, many utilities and third parties are offering “green power purchase agreements”, which are essentially “wind and solar performance contracts”. For example, if you want to put solar panels on your roof. A third party (often a utility or solar contractor) finances the project installation and then sells you the renewable energy produced from your roof (at a known price) for 15-25 years. So you get “green” power at no upfront cost, and a known future energy cost (lowers your risk to energy price volatility). The financier wins because the project will pay back their investment within 10 years and the rest is profit.
There are an unlimited number of creative “win-win” contracts available. However, before finalizing or even developing your solution, be sure that you understand the client’s strategic and financial goals and align the value to support the client’s larger objectives.
PROBLEM #3: MONEY
If you do a good job tapping into the passion behind the project and are satisfying the emotional, financial and other approval criteria, you should have enough benefits to get the project approved, especially if the project is above the client’s MARR. However, if your organization is capitally-constrained, you can finance a project and have positive cash flow. CFOs like positive cash flow projects! On the contrary, cash flow constraints (not having the upfront capital to install a project) represent over 35% of the reasons why projects are not implemented .
Financing does not have to be complicated. In fact, financing energy efficiency/green projects can be very similar to your mortgage or car payment; Fixed payments for a length of time. However, with a “good” project, you can finance the project such that the annual savings are greater than the finance payments- which means the project becomes “cash flow positive” and does not impact the capital budget! This can allow the approver to move forward without sacrificing any other budget line item.
Table 1 below shows the cash flow for a non-financed project . Assume the project costs $100,000 and saves $28,000 per year for 15 years. This project could get approved IF the client has $100,000 in cash to fund it. The project has a Net Present Value of $ 102,700 and an Internal Rate of Return of 27%.
Table 1- Project Cash Flow (paid with Cash)
Now, let’s look at financing the project with a simple loan. Let’s say the client finances the $ 100,000 for 15 years at 10% per year. That means that instead of investing $100,000 upfront (the bank provides these funds), the client pays $13,147 each year to the bank for 15 years. At the end of 15 years, the bank loan is paid off (just like a mortgage or car payment- just a different time period). To keep this simple, ignore interest tax deductions as well as depreciation- which would likely improve the financials even further.
Table 2- Financed Project Cash Flow
In this case, the project generates $14,853 each year for the client. Because there is no upfront investment required, the IRR value becomes infinity.
Adding in the “Green Benefits” could further illustrate the project’s benefits. Table 3 shows what some of these benefits could include. Note that it can be easier for the audience to visualize equivalencies (“car miles not driven”, or “trees planted”) instead of lbs of CO2.
Table 3- Green Benefits
However, there are even more benefits… when you consider the following impacts the project could have on:
• Shareholders in the Annual Report,
• Community Morale & “Green Image”,
• Productivity Improvements,
• Legal Risk Reduction,
• LEED Points, White Certificates, RECs
• FREE Public Press
FREE Money
In addition, there are utility rebates, tax refunds, credits, and other sources of free money that will improve a project’s financial return. Here are some useful websites that allow you to see utility and tax benefits in your state:
www.dsireusa.org/
www.energytaxincentives.org
http://www.efficientbuildings.org
http://www.lightingtaxdeduction.org/
But don’t just rely on websites. Use professionals- they should know what techniques, technologies and rebates are best for your geographic area.
SUMMARY
This article has described the 3 common barriers (Marketing, Education and Money) as well as a start on how to overcome them. To get a project approved:
1. Articulate the Problem/Pain
2. Collaborate to Add Value in the Solution
3. Quantify all the Benefits
4. Minimize Financial Risk
5. Develop/Configure an Executive Summary that “sings” to the hearts of the approver.
Hopefully, these techniques will help you get your next project approved. Why is this important… because the ice is melting! We are counting on you.
Defying the 3 Main Barriers to Energy Efficiency or Green Projects - To learn more about this author, visit Eric A. Woodroof's Website.
Like this article? Share it with your friends
OUTLINE
INTRODUCTION
PROBLEM #1: MARKETING
PROBLEM #2: EDUCATION & COLLABORATION
PROBLEM #3: MONEY
SUMMARY
INTRODUCTION
The polar ice is melting and as far as the planet is concerned, engineers are wasting their time if the projects they so carefully develop are not implemented and deliver no value. This article refers to “good” projects as those with a 3 year payback or less. Why don’t “good” projects get implemented? There are a variety of reasons and a few common barriers:
1. Marketing (under-marketing a project’s value)
2. Education & Collaboration (not expanding the value of a project)
3. Money (not having a positive cash flow solution)
If a project can’t beat these criteria, it probably won’t be implemented anyway… so focus on the ones that will!
PROBLEM #1: MARKETING
People often ask me why marketing is first on the list. Answer: because NOTHING HAPPENS WITHOUT A SALE. For example, your first job (or your first date) began with you “selling yourself” on a resume or during an interview. In fact, the development of every product/service begins with someone selling a solution to some type of problem. Now, I am not saying that selling/convincing is “bad” or un-ethical. Convincing someone when it improves their lives is good and can be done with passion. When something (like an energy management project) is great, we should sell the benefits with all the passion in the world. You would do the same when talking to your kids about “getting a good education”, or “learning good manners”. Passion can also emerge from fear, such as from the chaos and the violence that occurs during an electrical blackout. Most of the time, humans are more passionate and action-oriented when they are at risk of losing something versus gaining something.
So, we must communicate in a way so the audience (the buyer or project approver) can understand the problem/pain that they are in now. After they agree that they are “in pain”, then they will want to hear about potential solutions.
Attention:
It starts with getting the buyer’s attention on the problem, the pain it is causing and a sense of urgency to solve the problem. Only then will a solution seem to be logical. In addition, after they understand the problem/pain, they will be able to become passionate about the solution.
If you fail to get the attention of the approver, you are actually doing them a dis-service; they won’t know they are in trouble and are wasting money. It is like allowing someone to bleed to death when they don’t even know they are cut. So, don’t be shy- You have a duty to perform.
Warning! Some approvers personalities’ won’t like to hear about problems/pain. Some approvers may “put their head in the sand” (like an ostrich) when problems are discussed. Don’t blame them- it is their personality (which has strengths in other areas). Discover ways to communicate in a way that they will respond. FYI- it can take 7 impressions (explanations/presentations) before some people will agree on the problem and take action on a solution. Don’t give up and don’t be surprised or depressed when they don’t take action after the first impression.
Below are a few examples of effective headlines that can help get the attention of an approver. Feel free to use these in executive summaries:
• “How will the shareholders feel about us throwing money away every month?”
• “A way to make money while reducing emissions…”
• “What will we do with the Yearly Savings?”
• “We are paying for energy-efficiency projects, whether or not we do them!”
• “Guaranteed, High-Yield Investments…”
• “If you enjoy throwing money away every month, don’t read this…”
• “4.6 Billion Years of Reliability… Solar Energy”
• This Project could improve our Stock Price by over 20%!
• “Good Planets are hard to find”
There are many other great proven examples that are available. However- you can experiment by looking around for “marketing copy” in magazine advertisements, commercials, etc. There is a reason they call it “copy”- some of the principles are thousands of years old, and they still work! Just change the words to relate to your problem/solution. Try a few versions and test, test, test to see which ones are most effective. Go for it!
Benefits :
After you have their attention, be sure that you include compelling benefits that “take away the pain” that the audience is feeling. As engineers, we are good at mentioning the typical benefits:
• Saves energy, money, waste and emissions;
• Offsets the cost of a planned capital project;
• Improves cost-competitiveness, productivity, etc.;
• Is a relatively low-risk, high-profit investment that directly impacts the bottom line .
In today’s green-minded economy, we could also demonstrate that “green” projects are a very effective marketing tool (which could get the client’s marketing department behind your project), because these benefits have also been proven :
• Improves the client’s “green” image;
• Differentiates the client from the competition ;
• Introduces them to new markets, suppliers and clients , ;
• Helps them grow sales/revenue.
However, we should also mention the passionate, global and moral reasons behind a good “green” project:
• Slows global warming, reduces acid rain;
• Reduces mercury pollution, which allows us to eat healthy;
• Improves our national energy independence;
• Reduces security/disaster risks, etc..
Dollar values for these benefits can often be calculated and should be included in your proposal. To calculate the “green benefit equivalencies”, such as “number of trees planted” (from reduced power plant emissions), see the “Money” section of this article.
The list above can be expanded, refined and optimized for any project. To build a list like the one above, one technique is: “WSGAT”: “What is So Good About That?” Ask that question for every project feature, and you will develop a long list of passionate benefits. By the way- this approach has been used in TV sales and has helped sell billions of dollars of material . If they can sell this much junk on TV, we should have no problem selling green projects that are factually saving the planet! Add the emotional benefits of going “green”, and you will have a project that touches the hearts of leaders in your organization.
Call to Action:
The “call to action” becomes easy and logical when all of the benefits have been quantified and they are aligned with the client’s strategic objectives. Tell the approver what you want them to do and why. Be sure to include the “cost of delay” in your executive summary. Remind them that they are “in pain” and the project/solution will solve it. Visual aids can be helpful. For example, during one presentation, buckets of dollars were shoveled out a window to demonstrate the losses that were occurring every minute. The executives were literally in pain watching those dollars fly away. They couldn’t stand it, and they took action. It is OK to get creative and have some fun in your presentation!
BUT WAIT… THERE IS MORE! “Configuring” your presentation can make the difference between immediate approval and further delay. There are many ways to “configure” or “package” your product/project so that it is IRRESISTABLE. One way to do this is to find a way to make a project’s performance guaranteed or “risk-free”. Another way is to separate (or add) one part of the project and introduce it as a “free bonus”. Everyone likes a “FREE” bonus- it helps them understand that they are getting a “good” deal. For example, on a recent “green”, facility-related project, carbon offsets for a company’s fleet were included as a free bonus. The bonus delighted the client and differentiated the project, (and it was extra value) yet the additional costs were less than $1,000.
Engineers can be two, three or ten times more productive by developing sales and marketing skills. However, there is another reason for developing these sales/marketing skills: Your Career! The skills you learn will be valuable to your organization (as well as other organizations). These skills are transferable to other industries too. So keep this in mind when you are investing in yourself… there will almost always be a fantastic pay-off.
Finally, there are two prerequisites that a buyer must see in you before any sale is made: “Trust” and “Value”. As far as trust goes, it must be earned and once it is earned… it must be cherished. To accelerate the buyer’s trust in you: be an advocate for the client and put their needs ahead of your own. Assume the role of their “most trusted advisor”, (and then deliver). Value comes from applying knowledge, tools, resources, partners, etc., in the best way for the client, which is why education and collaboration is such an important component of success. This is discussed further in the next section. Be sure to read the sub-sections on Reciprocal Business Agreements, Joint Ventures and Incentives/Rebates… great ideas!
PROBLEM #2: EDUCATION & COLLABORATION
Knowing how to deliver the value is an area that requires continuous updating. Today, with the proliferation of energy/green technologies, it is impossible for one person to know all the ways to add value to a project. Green specialties are expanding every day. For example: energy efficiency, water efficiency, green janitorial, LEED , recycling, transportation, etc..
Learn all you can, then collaborate with other professionals (who are also actively learning) and the value available to your clients’ increases exponentially. It is important to be open to new ideas and fresh perspectives in this process. “Mind-Sharing” or brain-storming techniques can facilitate the process and maximize the number of useful ideas.
Fortunately, education is a low-cost investment. Collaboration and even joint-ventures/partnering can be done inexpensively as well and the returns can be huge!
Free Sources of Green/Energy Efficiency Education:
https://www.aeecenter.org/seminars/
http://www.eere.energy.gov/
http://www.ashrae.org/education/
www.usgbc.org
www.ase.org
www.energystar.org
http://greeninginterior.doi.gov
In addition, there are many innovative ways to bring more value to a project. Some include:
• Reciprocal Business Agreements
• Joint Ventures
• Free Tax and Utility Incentives/Rebates
Reciprocal Business Agreements:
For Example: After presenting a $1,000,000 service contract for a global car rental company, the deal was sweetened with an agreement on our part to choose that car company while traveling, which generated over $1,000,000 in extra car rentals for them. To the client, they were getting an extra $1,000,000 in revenue by working with us versus the competitors. What suppliers, partners, colleagues, professionals, etc. could you develop reciprocal business agreements? How could you help two clients (or a supplier) benefit from each other? How could you help them become more “green”?
Another Example: We helped client #1 supply green solutions to client #2. Both clients were extremely happy to generate more sales / save money. When it was time to approve our next round of projects, there was little resistance, because we had helped them earn / save far more than the costs of the proposed projects. This illustrates the value of being the “trusted advisor”.
Joint Ventures:
For Example: A “green” travel agency gives 50% of its commissions back to its clients in exchange for their travel business. The client can use this extra, free money to fund “green” initiatives or scholarships, or other social programs. The travel agency guarantees the lowest prices and easily doubles its business because it delivers more value to its clients via joint ventures.
Free Tax and Utility Incentives/Rebates:
For Example: In California, 50% of a solar project was funded by federal and state rebates. Utility incentives lowered the installation costs even further. There are numerous free tax and utility incentives available, and some are discussed in the next section.
In addition to the options above, many utilities and third parties are offering “green power purchase agreements”, which are essentially “wind and solar performance contracts”. For example, if you want to put solar panels on your roof. A third party (often a utility or solar contractor) finances the project installation and then sells you the renewable energy produced from your roof (at a known price) for 15-25 years. So you get “green” power at no upfront cost, and a known future energy cost (lowers your risk to energy price volatility). The financier wins because the project will pay back their investment within 10 years and the rest is profit.
There are an unlimited number of creative “win-win” contracts available. However, before finalizing or even developing your solution, be sure that you understand the client’s strategic and financial goals and align the value to support the client’s larger objectives.
PROBLEM #3: MONEY
If you do a good job tapping into the passion behind the project and are satisfying the emotional, financial and other approval criteria, you should have enough benefits to get the project approved, especially if the project is above the client’s MARR. However, if your organization is capitally-constrained, you can finance a project and have positive cash flow. CFOs like positive cash flow projects! On the contrary, cash flow constraints (not having the upfront capital to install a project) represent over 35% of the reasons why projects are not implemented .
Financing does not have to be complicated. In fact, financing energy efficiency/green projects can be very similar to your mortgage or car payment; Fixed payments for a length of time. However, with a “good” project, you can finance the project such that the annual savings are greater than the finance payments- which means the project becomes “cash flow positive” and does not impact the capital budget! This can allow the approver to move forward without sacrificing any other budget line item.
Table 1 below shows the cash flow for a non-financed project . Assume the project costs $100,000 and saves $28,000 per year for 15 years. This project could get approved IF the client has $100,000 in cash to fund it. The project has a Net Present Value of $ 102,700 and an Internal Rate of Return of 27%.
Table 1- Project Cash Flow (paid with Cash)
Now, let’s look at financing the project with a simple loan. Let’s say the client finances the $ 100,000 for 15 years at 10% per year. That means that instead of investing $100,000 upfront (the bank provides these funds), the client pays $13,147 each year to the bank for 15 years. At the end of 15 years, the bank loan is paid off (just like a mortgage or car payment- just a different time period). To keep this simple, ignore interest tax deductions as well as depreciation- which would likely improve the financials even further.
Table 2- Financed Project Cash Flow
In this case, the project generates $14,853 each year for the client. Because there is no upfront investment required, the IRR value becomes infinity.
Adding in the “Green Benefits” could further illustrate the project’s benefits. Table 3 shows what some of these benefits could include. Note that it can be easier for the audience to visualize equivalencies (“car miles not driven”, or “trees planted”) instead of lbs of CO2.
Table 3- Green Benefits
However, there are even more benefits… when you consider the following impacts the project could have on:
• Shareholders in the Annual Report,
• Community Morale & “Green Image”,
• Productivity Improvements,
• Legal Risk Reduction,
• LEED Points, White Certificates, RECs
• FREE Public Press
FREE Money
In addition, there are utility rebates, tax refunds, credits, and other sources of free money that will improve a project’s financial return. Here are some useful websites that allow you to see utility and tax benefits in your state:
www.dsireusa.org/
www.energytaxincentives.org
http://www.efficientbuildings.org
http://www.lightingtaxdeduction.org/
But don’t just rely on websites. Use professionals- they should know what techniques, technologies and rebates are best for your geographic area.
SUMMARY
This article has described the 3 common barriers (Marketing, Education and Money) as well as a start on how to overcome them. To get a project approved:
1. Articulate the Problem/Pain
2. Collaborate to Add Value in the Solution
3. Quantify all the Benefits
4. Minimize Financial Risk
5. Develop/Configure an Executive Summary that “sings” to the hearts of the approver.
Hopefully, these techniques will help you get your next project approved. Why is this important… because the ice is melting! We are counting on you.
Defying the 3 Main Barriers to Energy Efficiency or Green Projects - To learn more about this author, visit Eric A. Woodroof's Website.
Like this article? Share it with your friends
![]() | |
| |
No article feedback found. |
| |
Leave Your Feedback |
|
| |
| |||
George LudwigGeorge Ludwig is a recognized authority on sales strategy and peak performance psychology. An international speaker, trainer, and corporate consultant, he helps clients like Johnson & Johnson, Abbott Laboratories, Northwestern Mutual, CIGNA, and numerous others improve sales force effectiveness and performance. Though it's George's strategies and processes that help corporations increase productivity and performance, it's his tremendous energy and dynamism that spark the transformation. Again and again, clients remark on his amazing ability to unleash human capacity and inspire men and women to break out of their comfort zones. The result is a whole new type of salesperson. His customized presentations teach achievers to make stunning advances in their lives. From helping salespeople realize cherished dreams to helping corporations exponentially accelerate revenue streams, George Ludwig leaves audiences and individuals empowered, emboldened, and clamoring for more. George is the best-selling author of Power Selling: Seven Strategies for Cracking the Sales Code and Wise Moves: 60 Quick Tips to Improve Your Position in Life & Business. - Visit George Ludwig's Website |
|||
|
To learn more about the Evan Elite Author Program please contact us. | |||
![]() | |
![]()
| |
![]() | |
|
| |
![]() | |
|
| |
![]() | |||||||
|
![]() | ||
|
| ||
![]() |
| Have you written articles that would be of value to entrepreneurs? Become an expert on our site by publishing them! Expose yourself to a wide audience, drive more traffic to your website and get more sales! Click Here for details. |
|
|
![]() |
| Modeling the Masters: Learn the true secrets behind Walt Disney's business success factors & grow your company! Video produced by Phanta Media |
|
|
![]() |
"Learn straight from Evan how you can Make a Full Time Income (And More) from a Website"
Click Here To Learn More |
|
|
|
|
Get advice & tips from famous business owners, new articles by entrepreneur experts, my latest website updates, & special sneak peaks at what's to come!
|
![]() |
|
|
![]() | ||
|
Top 50 SEO Posts - 2008
Top SEO Posts of the Year | ||
|
Top 50 Productivity Blogs
Top Blogs To Watch In 2008 | ||
![]() | ||
![]() | ||||
| ||||
| ||||
| ||||
|
|
|
|
|
||||||||||||
|
|
|
|
|






Subscribe to Eric's articles